Chicago's Halsted Pointe Reveals New Towers, a Riverfront Beach and a Water Taxi Stop. Here's the Vision
Proposed Pointe Beach at the southern tip of Goose Island. Rendering by SCB via Chicago YIMBY.
GOOSE ISLAND, CHICAGO—A former industrial property along the Chicago River could eventually become one of the city's most ambitious new waterfront neighborhoods, complete with residential skyscrapers, public parks, outdoor recreation and a sandy riverfront gathering area.
New renderings released November 15, 2026, reveal an updated master plan for Halsted Pointe, a major mixed-use development at 931 N. Halsted Street on the southern tip of Goose Island.
Led by developer Onni Group, the project envisions five residential towers, a hotel, retail spaces and approximately 1,300 feet of riverwalk connecting new landscaped public areas.
The latest designs also show a proposed water taxi stop, kayak launch, playgrounds, pickleball courts and a beach-like recreation space overlooking the Chicago River.
Unlike many early-stage development concepts, Halsted Pointe already has construction underway. Its first 46-story residential tower broke ground earlier this year.
However, the newly illustrated waterfront amenities and remaining buildings are planned future phases, not completed attractions or guaranteed additions.
Here's what the updated vision includes and what could eventually change along Goose Island's riverfront.
What's New in the Halsted Pointe Master Plan?
The latest designs, prepared by Chicago architecture firm SCB, offer a more detailed look at how Halsted Pointe's buildings and open spaces could fit together.
Earlier versions of the development had already introduced high-rise housing, commercial space and a public riverwalk.
The new presentation goes further by showing how residents and visitors might actually use the waterfront.
The revised plan features:
More than 1,300 feet of riverwalk connecting landscaped plazas and gathering areas.
A sandy riverfront recreation area with umbrellas, seating and views of the Chicago River.
A proposed water taxi stop that could introduce another transportation option if service is established.
A kayak launch with stepped seating near the water.
Approximately five acres of landscaped public space, including lawns, walking paths and outdoor gathering areas.
Pickleball courts, playgrounds and a dog run for recreation.
A proposed Divvy bike station, new pedestrian connections and a possible future bridge.
The designs also reorganize parts of the development's pedestrian routes and vehicle drop-off areas.
The goal is to make the property more than a collection of residential towers. The plans envision a district where people could walk beside the river, visit restaurants and spend time outdoors.
A pedestrian view of the proposed Halsted Pointe riverwalk. Rendering by SCB via Chicago YIMBY.
A Riverfront Beach, Kayak Launch and Water Taxi Stop
Some of the most attention-grabbing features are planned for the southern tip of Goose Island, where the North Branch of the Chicago River meets the North Branch Canal.
The new renderings show an area identified as Pointe Beach, a sand-filled public recreation space with rows of umbrellas, seating and monumental stone steps leading toward the waterfront.
The concept resembles a lakefront gathering area, but it is important to note that no designated swimming beach or swimming access has been confirmed.
Nearby, a landscaped area called Pointe Park would provide additional open space, while a proposed water taxi stop could eventually connect the development with other destinations along the river.
Farther north, another public area known as The Piazza would feature stepped seating, a playground and access to a planned kayak launch.
The design also includes The Commons, a sloping lawn intended for relaxing and gathering near the residential towers.
Together, these spaces could create a continuous waterfront experience, allowing visitors to walk along the river instead of encountering a largely inaccessible former industrial property.
The proposed water taxi station is particularly interesting, given the development's location near River North and other riverfront destinations.
However, a station shown in a rendering does not mean that water taxi service has been approved, scheduled or guaranteed.
Those transportation details would need to be resolved separately as the development progresses.
Five Residential Towers and a New Hotel Are Planned
Halsted Pointe's full vision includes several buildings organized into four development areas.
The first phase, known as Subarea A, is already under construction at 931 N. Halsted Street.
Proposed residential towers and landscaped public space at Halsted Pointe. Rendering by SCB via Chicago YIMBY.
The 46-story tower is designed to reach approximately 500 feet and include 464 apartments, about 19,000 square feet of retail space and 200 parking spaces.
The remaining phases would add four more residential towers and a hotel.
Subarea B: Two Towers and Riverfront Recreation
Located east of the first tower, this phase would introduce two residential buildings rising 44 and 51 stories.
Together, they are planned to contain 1,134 apartments, along with retail, an outdoor pool deck and access to riverfront amenities.
Subarea C: Two More Towers Near Pointe Beach
Farther south, another two buildings would rise 44 and 46 stories, adding 1,052 apartments.
This phase would include more than 10,000 square feet of ground-floor retail and connections to the proposed riverfront beach, landscaped lawns and recreation areas.
Subarea D: A 162-Room Hotel
The final development area would feature a 13-story hotel with 162 rooms, along with food-and-beverage space.
A hotel operator has not been announced.
Across all phases, the latest plans show approximately 2,650 apartments, including the 464 units in the first tower and another 2,186 units proposed for future phases.
Of the additional apartments, 438 are designated as affordable in the current plan.
These figures remain subject to changes as future construction phases advance.
When Will Halsted Pointe Be Completed?
Halsted Pointe is moving forward in stages, which means the entire district will not open at once.
Construction began on its first residential tower in spring 2026, and crews have continued working on the building's structure.
The current projected completion date for that tower is September 2028.
The November master plan also outlines a preliminary schedule for the remaining phases:
Subarea A: First 46-story residential tower, under construction, with completion projected for September 2028.
Subarea B: Two residential towers, with construction tentatively scheduled from August 2027 through December 2030.
Subarea C: Two additional residential towers, tentatively scheduled from late 2029 through mid-2033.
Subarea D: Hotel development, tentatively scheduled from early 2032 through late 2033.
These are projected development timelines rather than guaranteed completion dates.
Construction on the first tower does not mean every other component has secured its required approvals, financing or construction permits.
Public spaces, retail areas and transportation features may also open at different times as the project advances.
The most important distinction for residents is that the first tower is underway, while the full waterfront district remains a long-term vision.
What Happens Next for Halsted Pointe?
The immediate focus remains on completing the first residential tower while refining plans for the rest of the development.
The newly released master plan offers a clearer picture of how the future buildings, parks and pedestrian connections might work together.
If the remaining phases advance, Halsted Pointe could introduce a substantial new residential community and transform a significant stretch of Goose Island's riverfront.
But key parts of that vision, including the beach-like recreation area, kayak launch, water taxi stop and additional towers, remain proposed.
For now, the latest renderings provide a glimpse of what Goose Island's southern waterfront could look like over the next several years, rather than a promise that every feature will be built.
For readers following the project's construction history, see our earlier coverage: Halsted Pointe Breaks Ground on 46-Story Tower on Goose Island.
Explore Chicago Riverfront Living With Local Expertise
From Goose Island's emerging residential development to established condominium communities in River North, Streeterville and the Near North Side, Chicago offers a variety of options for people interested in living near the river and Downtown.
For buyers and relocation clients, understanding which developments are under construction and which remain proposed can help make neighborhood decisions more informed.
The Cory Tanzer Group at Option Premier helps buyers, sellers and renters compare Chicago neighborhoods, evaluate available properties and understand local real estate conditions.
Considering a move to River North, River West or another Downtown Chicago neighborhood? Connect with our team to explore available properties and find a home that fits your lifestyle and budget.
Stay Connected
Ranked among the top 1% of real estate teams in the Chicagoland market, The Cory Tanzer Group at Option Premier is recognized for proven sales performance, neighborhood expertise, and consistent results across Chicago and the surrounding suburbs.
In the 2026 RealTrends Verified rankings, based on 2025 sales data, the team completed 181 transaction sides representing $79.28 million in sales volume. The Cory Tanzer Group ranked No. 13 in Illinois by transaction sides, No. 20 in Illinois by sales volume, No. 270 nationally by transaction sides, and No. 439 nationally by sales volume.
The team also earned The CARLY, the highest honor for Platinum Sales Dollars and Platinum Units Sold, at the Chicago Association of REALTORS® Sales Awards.
Led by Cory Tanzer, the team helps buyers, sellers, investors, landlords, and renters navigate real estate across Downtown Chicago, the North Shore, and the Western Suburbs, with local expertise in University Village, University Commons, South Loop, West Loop, Little Italy, Pilsen, and surrounding Chicagoland communities.
Connect with The Cory Tanzer Group at Option Premier for trusted local market insight, personalized guidance, and a proven strategy for your next Chicago real estate move.